Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

please answer correctly and clearly Kluver Enterprises manufactures tires for the Formula I motor racing circuit. For August, it budgeted to manufacture and sell 3,900

please answer correctly and clearly
image text in transcribed
image text in transcribed
image text in transcribed
Kluver Enterprises manufactures tires for the Formula I motor racing circuit. For August, it budgeted to manufacture and sell 3,900 tires at a variable cost of $79 per tire and total fixed costs of $66,000. The budgeted selling price was $112 per tire. Actual results in August were 3,600 tires manufactured and sold at a selling price of $115 per tire. The actual total variable costs were $298,800, and the actual total fixed costs were $64,500. Required 1. Prepare a performance report that uses a flexible budget and a static budget. 2. Comment on the results in requirement 1 . Requirement 1. Prepare a performance report that uses a flexible budget and a static budget. Begin with the actual results, and then complete the flexible budget columns and the static budget columns. Label each variance as favourable or unfavourable. (For variances with a $0 balance, make sure to enter "0" in the appropriate field. If the variance is zero, do not select a label. Use parentheses or a minus sign when entering an anoratinn lnse 1 Kluver Enterprises manufactures tires for the Formula I motor racing circuit. For August, it budgeted to manufacture and sell 3,900 tires at a variable cost of $79 per tire and total fixed costs of $66,000. The budgeted selling price was $112 per tire. Actual results in August were 3,600 tires manufactured and sold at a selling price of $115 per tire. The actual total variable costs were $298,800, and the actual total fixed costs were $64,500. 1. Prepare a performance report that uses a flexible budget and a static budget. Required 2. Comment on the results in requirement 1. Requirement 1. Prepare a performance report that uses a flexible budget and a static budget. Begin with the actual results, and then complete the flexible budget columns and the static budget columns. Label each variance as favourable or unfavourable. (For variances with a $0 balance, make sure to enter "0" in the smnmnriate field. If the variance is zero, do not select a label. Use parentheses or a minus sign when entering an

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Tax Audit Approach And Due Diligence Related To Tax Credits

Authors: Mohamed Ben Sassi

1st Edition

6204246941, 978-6204246949

More Books

Students also viewed these Accounting questions