*** Please show work in Excel with formulas used. Review Concept Box 16.2. The investor-developer would not be comfortable with a 7.8 percent return on

*** Please show work in Excel with formulas used.

Review Concept Box 16.2. The investor-developer would not be comfortable with a 7.8 percent return on cost because the margin for error is too risky. If construction costs are higher or rents are lower than anticipated, the project may not be feasible.

  1. Based on the fact that the project appears to have 9,360 square feet of surface area in excess of zoning requirements, the developer could make an argument to the planning department for an additional 10 units, 250 units in total, or 25 units per acre. How would this affect financial feasibility? What could be included in such an argument? Why would a public regulatory institution be interested in increasing density to 25 units per acre? Why not?

  2. Instead of (a), suppose the developer could build a 240-unit luxury apartment complex with a cost of $83,000 per unit. What would such a project have to rent for (per square foot) to make an 8 percent return on total cost? What risk factors would the developer have to consider?

Concept Box 16.2 Preliminary Feasibility AnalysisApartment Project Development

  1. Physical Feasibility:

  1. Goal: To provide a preliminary development plan analysis to determine whether an apartment project can be built on a specific site in accordance with regulatory requirements and leased at current rental rates in order to justify land acquisition.

  2. Site: 10 acres or 435,600 sq.ft.

  3. Asking price: $2,800,000

  4. Basic project description/zoning:

    1. Setback requirements: 15%

    2. Circulation requirements: 15%

    3. Maximum units per acre: 24 (based on a unit mix of 1-, 2-, and 3-bedroom apartments; weighted average=900 sq.ft.weighted average=900 sq.ft. per unit)

    4. Parking requirements: 1.5 spaces per unit @ 400 sq.ft. per space

    5. Open space, berms, landscape, support area: 1.0 acre (required) based on 240 units

    6. Maximum building height: 2 stories

  5. Physical feasibility (in square feet):

  1. Gross land area

435,600

Less: Setbacks

65,340

Circulation

65,340

Open space/support/other

43,560

  1. Area available for building development:

261,360

Less: Surface parking, 240 units 1.5 spaces 400sq. ft.240 units 1.5 spaces 400sq. ft.

144,000

  1. Net surface area available for building

117,360

  1. Proposed total footprint areas for buildings, (240 units 900sq . ft.)2240 units 900sq . ft.2 stories

108,000

Excess (or deficiency) of square footage versus zoning requirements:

9,360

Conclusion: It appears that the site can accommodate a 240-unit apartment project and comply with zoning requirements.

  1. Financial Feasibility:

  1. Construction cost per unit: $80,000 240 units$80,000 240 units

$ 19,200,000

  1. Asking price for land:

2,800,000

Total project cost:

$22,000,000*

  1. Gross revenue after lease-up and stabilization:

Rent: $1.10 per sq.ft. @ 900 sq.ft. @ 240 units12 months240 units12 months

$2,851,200

Less:

Average vacancy (5%)

142,560

Operating expenses (35%)

997,920

Net operating income

$ 1,710,720

  1. Return on total cost ($1,710,720 $22,000,000)$1,710,720 $22,000,000

7.78%

  1. Approximate value based on NOI:

  1. If cap rate=.078If cap rate=.078

$ 22,000,000

  1. If cap rate=.08If cap rate=.08

$ 21,384,000

  1. If cap rate=.07If cap rate=.07

$ 24,439,000

  1. Conclusion: Project may be feasible if the investor/developer is willing to accept a total return on cost of 7.8%. If, upon completion, investors are pricing comparable projects at a cap rate of .08, this proposed project would not be feasible because value ($21,384,000) is less than cost ($22,000,000). If projects are being priced at cap rates of .07, the project would produce a sizable development profit of $2,439,000 (or $24,439,000$22,000,000).

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Finance questions

Question

What is a depositary receipt?

Answered: 1 week ago