prepare a cost of goods manufactured schedule fof June
12.4/20 Prepare a cost of goods manufactured schedule for June. CASE INC. Cost of Goods Manufactured Schedule Raw Materials, June 1 $ $ e Textbook and Media List of Accounts Case Inc. is a construction company specializing in custom patios. The patios are constructed of concrete, brick, fiberglass, and lumber, depending upon customer preference. On June 1, 2020, the general ledger for Case Inc. contains the following data. Raw Materials Inventory Work in Process Inventory $4,500 $5,150 Manufacturing Overhead Applied Manufacturing Overhead Incurred $34,100 $31,100 Subsidiary data for Work in Process Inventory on June 1 are as follows. Job Cost Sheets Customer Job Cost Element Rodgers Stevens Direct materials $500 $700 Direct labor 300 600 Manufacturing overhead 750 $1,175 $2,050 Linton $800 500 625 $1,925 375 During June, raw materials purchased on account were $4,900, and all wages were paid. Additional overhead costs consisted of depreciation on equipment $800 and miscellaneous costs of $400 incurred on account. A summary of materials requisition slips and time tickets for June shows the following. 888 7 % & 20 = Direct labor Manufacturing overhead 300 375 600 750 500 625 $1,175 $2,050 $1,925 During June, raw materials purchased on account were $4,900, and all wages were paid. Additional overhead costs consisted of depreciation on equipment $800 and miscellaneous costs of $400 incurred on account. A summary of materials requisition slips and time tickets for June shows the following. Customer Job Rodgers Koss Stevens Linton Rodgers Materials Requisition Slips $700 2,000 500 1,400 300 4.900 1,600 $6,500 Time Tickets $800 800 400 1,300 500 3,800 1,200 $5,000 General use Overhead was charged to jobs at the same rate of $1.25 per dollar of direct labor cost. The patios for customers Rodgers, Stevens, and Linton were completed during June and sold for a total of $20,200. Each customer paid in full. 80 888