Problem 5-1 Determine the utilization and the efficiency for each of these situations: a. A loan processing operation that processes an average of 7 loans
Problem 5-1
Determine the utilization and the efficiency for each of these situations: |
a. | A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day. (Round your answer to 1 decimal place. Omit the "%" sign in your response.) |
Utilization | % |
Efficiency | % |
b. | A furnace repair team that services an average of four furnaces a day if the design capacity is six furnaces a day and the effective capacity is five furnaces a day. (Round your answer to 1 decimal place. Omit the "%" sign in your response.) |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started