Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Problem 6 - 0 4 You are considering two assets with the following characteristics. E ( R 1 ) = 0 . 1 8

Problem 6-04
You are considering two assets with the following characteristics.
E(R1)=0.18\sigma 1=0.12 w1=0.6
E(R2)=0.21\sigma 2=0.25 w2=0.4
Compute the mean and standard deviation of two portfolios if r1,2=0.45 and -0.40, respectively. Do not round intermediate calculations. Round your answers for the mean of two portfolios to three decimal places and answers for standard deviations of two portfolios to five decimal places.
Mean of two portfolios:
Standard deviation of two portfolios if r1,2=0.45:
Standard deviation of two portfolios if r1,2=-0.40:
Choose the correct riskreturn graph.
The correct graph is
-Select-
.
A.
Expected return is plotted as a function of risk. Expected return is measured from zero to 30 percent on the vertical axis. Risk in form of standard deviation is measured from zero to 20 percent on the horizontal axis. Point A is marked at (14.7,17.2) and corresponds to r subscript 1,2 end subscript equal to 0.45. Point B is marked at (5.7,17.2) and corresponds to r subscript 1,2 end subscript equal to -0.40. A straight horizontal line goes from the horizontal axis to point B through point 'A'.
B.
Expected return is plotted as a function of risk. Expected return is measured from zero to 30 percent on the vertical axis. Risk in form of standard deviation is measured from zero to 20 percent on the horizontal axis. Point A is marked at (14.7,14.2) and corresponds to r subscript 1,2 end subscript equal to 0.45. Point B is marked at (9.7,14.2) and corresponds to r subscript 1,2 end subscript equal to -0.40. A straight horizontal line goes from the horizontal axis to point B through point 'A'.
C.
Expected return is plotted as a function of risk. Expected return is measured from zero to 30 percent on the vertical axis. Risk in form of standard deviation is measured from zero to 20 percent on the horizontal axis. Point A is marked at (9.7,19.2) and corresponds to r subscript 1,2 end subscript equal to 0.45. Point B is marked at (14.7,19.2) and corresponds to r subscript 1,2 end subscript equal to -0.40. A straight horizontal line goes from the horizontal axis to point B through point 'A'.
D.
Expected return is plotted as a function of risk. Expected return is measured from zero to 30 percent on the vertical axis. Risk in form of standard deviation is measured from zero to 20 percent on the horizontal axis. Point A is marked at (14.7,19.2) and corresponds to r subscript 1,2 end subscript equal to 0.45. Point B is marked at (9.7,19.2) and corresponds to r subscript 1,2 end subscript equal to -0.40. A straight horizontal line goes from the horizontal axis to point A through point B.
Explain the results.
The negative correlation coefficient
-Select-
risk without sacrificing return.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Management Core Concepts

Authors: Raymond M Brooks

3rd edition

133866696, 978-0133866698

More Books

Students also viewed these Finance questions