Question
Product Costing: Company-wide Overhead Versus ABC LaMesa produces machine parts as a contract provider for a large manufacturing company. LaMesa produces two particular parts, shafts
Product Costing: Company-wide Overhead Versus ABC LaMesa produces machine parts as a contract provider for a large manufacturing company. LaMesa produces two particular parts, shafts and gears. The competition is keen among contract producers, and LaMesa's top management realizes how vulnerable its market is to cost-cutting competitors. Hence, having a very accurate understanding of costs is important to LaMesa's survival. LaMesa's president, Jose Rodriguez, has observed that the company's current cost to produce shafts is $21.35, and the current cost to produce gears is $12.36. He indicated to the controller that he suspects some problems with the cost system because LaMesa is suddenly experiencing extraordinary competition on shafts, but it seems to have a virtual corner on the gears market. He is even considering dropping the shaft line and converting the company to a one-product manufacturer of gears. He asked the controller, Felix Bernhardt, to conduct a thorough cost study and to consider whether changes in the cost system are necessary. The controller collected the following data about the company's costs and various manufacturing activities for the most recent month:
Shafts | Gears | |
---|---|---|
Production units | 50,000 | 10,500 |
Selling price | $31.86 | $24.00 |
Overhead per unit (based on direct labor hours) | $12.82 | $6.10 |
Materials and direct labor cost per unit | $8.53 | $6.26 |
Number of production runs | 10 | 20 |
Number of purchasing and receiving orders processed | 40 | 100 |
Number of machine hours | 12,750 | 6,000 |
Number of direct labor hours | 25,000 | 2,500 |
Number of engineering hours | 5,000 | 5,000 |
Number of material moves | 50 | 40 |
The controller was able to summarize the company's total manufacturing overhead into the following pools:
Setup costs | $30,000 |
Machine cost | 175,000 |
Purchasing and receiving costs | 210,000 |
Engineering costs | 200,000 |
Materials handling costs | 90,000 |
Total | $705,000 |
a. Calculate LaMesa's current company-wide overhead rate based on direct labor hours. Round rate to two decimal places. $Answer per direct labor hour b. Verify LaMesa's calculation of overhead cost per unit of $12.82 for shafts and $6.10 for gears. Use rounded rate calculated above. Round per unit rate to two decimal places.
Rate | X | Hours | = | Overhead | Units | = | Per Unit | |||||||
Shafts: | $Answer | Answer | Answer | Answer | $Answer | |||||||||
Gears: | $Answer | Answer | Answer | Answer | $Answer |
c. Calculate the manufacturing overhead cost per unit for shafts and gears using activity-based costing, assuming each of the five cost pools represents a separate activity pool. Round answers to two decimal places, if needed.
Setup | $ per production run |
Machine | $ per machine hour |
Purchasing & receiving | $ per order |
Engineering | $ per hour |
Materials handling | $ per move |
Use the most appropriate activity driver for assigning activity costs to the two products. Use rounded overhead rates calculated above for calculations below. Round cost answers to the nearest whole number, when needed. Round overhead cost per unit to two decimal places.
Shafts | Gears | |
---|---|---|
Setup | $Answer | $Answer |
Machine | Answer | Answer |
Purchasing | Answer | Answer |
Engineering | ||
Materials handling | ||
Total ABC overhead cost | ||
Number of units produced | ||
Overhead cost per unit |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started