Answered step by step
Verified Expert Solution
Question
1 Approved Answer
PRODUCTION LINE FIRST PRODUCTION LINE Second PRODUCTION LINE TOTAL Configuration and installation of machines 60 75 135 Shipping and transportation 45 30 75 Maintenance and
PRODUCTION LINE | FIRST PRODUCTION LINE | Second PRODUCTION LINE | TOTAL |
Configuration and installation of machines | 60 | 75 | 135 |
Shipping and transportation | 45 | 30 | 75 |
Maintenance and operation | 35 | 55 | 90 |
Total | 140 | 160 | 300 |
If an engineer is randomly summoned to the factory management:
What is the probability that this engineer is:
1- From the second production line
A. Engineers preparing and installing machines or shipping and transport engineers.
P from the second production line or from the maintenance and operation engineers.
4- From the first production line and from the engineers of preparing and installing machines
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started