Question
Provide a brief description of the given classes of buildings according to the National Construction Code. Building Class Description Class 2 building Class 3 building
Provide a brief description of the given classes of buildings according to the National Construction Code.
Building Class | Description | |
Class 2 building | ||
Class 3 building | ||
Class 4 building | ||
Class 5 building | ||
Class 6 building | ||
Class 7a building | ||
Class 7b building | ||
Class 8 building | ||
Class 9a building | ||
Class 9b building | ||
Class 9c building | ||
3. Identify the state or territory you are based in. Then, based on your state or territory, identify the following:
The state or territory you identify must be the same throughout the assessments.
Some acts or regulations may be repeated so long as they cover both groups of building classes (i.e. Class 2, 3, and 9 buildings, and Class 5, 6, 7, and 8 buildings).
in victoria melbourne
State/Territory |
|
Act relevant to the construction of Class 2, 3, 4 or 9 buildings |
|
Set of regulations relevant to the construction of Class 2, 3, 4 or 9 buildings |
|
Act relevant to the construction of Class 5 to Class 8 buildings |
|
Set of regulations relevant to the construction of Class 5 to Class 8 buildings |
|
4. List the six bushfire attack level ratings that AS 3959 uses to establish the requirements for construction.
i.
ii.
iii.
iv.
v.
vi.
5. List four methods of testing that AS/NZS 4020 prescribes for testing products that come into contact with drinking water
i.
ii.
iii.
iv.
6. Answer the following:
i. Briefly explain what the General Requirements of buildings are. ?
ii. Briefly explain what the Performance Requirements of buildings are.?
iii. Briefly explain what Deemed-to-Satisfy Solutions are. ?
iv. Briefly explain the relationship between a building's Performance Requirements and compliance options (e.g. performance solutions, deemed-to-satisfy solutions).?
7. Using the table below:
Identify three assessment methods that performance solutions use to demonstrate that performance requirements have been met.
Briefly explain what each of the assessment methods are
Assessment Method | Explanation |
|
|
|
|
|
|
8. Provided in the table below are different building properties of Class 2 to Class 9 buildings. For each building property, provide one performance requirement according to the National Construction Code (NCC) Volume 1.
Building Property | Performance Requirement |
Structural stability during a fire |
|
Weatherproofing |
|
Fire extinguishers |
|
Personal hygiene facilities |
|
Safe movement to and within a building |
|
9. Provided in the table below are different building properties of Class 2 to Class 9 buildings. Describe the how the verification method for each building property of the buildings must be implemented.
Building Property | Verification Method |
Structural robustness |
|
Access to and within a building |
|
10. Answer the following questions:
Identify the four steps in the development of Performance Solutions
Provide a brief explanation of each step of the development of Performance Solutions
Steps in Developing Performance Solutions | Brief Explanation of Each Step |
1. |
|
2. |
|
3. |
|
4. |
|
11. List six ways that the evidence of suitability for building materials and products is established.
|
|
|
|
|
|
12. Complete the table below by identifying the type of fire-resisting construction (i.e. Type A, Type B, or Type C) given the following:
Class of building
Number of storeys each class of building has.
Rise in Storeys | Class of building: 2, 3, 9 | Class of building: 5, 6, 7, 8 |
4 or more |
|
|
3 |
|
|
2 |
|
|
1 |
|
|
13. Briefly describe the following cut-and-cover below ground construction methods:
Bottom-up method
Top-down method
Method | Explanation |
Bottom-up method |
|
Top-down method |
|
14. Briefly explain how the given steps in the cut-and-cover bottom-up method ensure the structural sufficiency of a below ground structure.
Step | Explanation |
Installation of retaining wall |
|
Excavation and installation of steel strut |
|
Construction of underground structure |
|
Backfilling and reinstatement |
|
15. Briefly explain how the following types of waterproofing provide underground water protection:
Explanation for Waterproofing Type C must include how water is collected and expelled from underground structures.
Waterproofing type | Explanation |
Waterproofing Type A |
|
Waterproofing Type B |
|
Waterproofing Type C |
|
16. For each of the given below ground construction hazard, provide two control measures to mitigate the risk associated with each hazard.
Hazard | Control Measures |
Confined spaces with build-up of gas and fumes |
|
Rock falls |
|
Heat stress |
|
Failure of floor or roadway |
|
16. Access and review the following documents regarding quality management systems of Cascade Peaks Construction that are included with this workbook:
Cascade Peaks Construction Quality System - Beginning Construction
Cascade Peaks Construction Quality System - Mandatory Inspections
answer the following questions:
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started