PT X is building a 2 7 5 km natural gas transmission line from Gresik to supply gas for power generation and industry in Semarang,
PT X is building a km natural gas transmission line from Gresik to supply gas for power generation and industry in Semarang, Central Java with a capacity of mmscfd If the investment cost of the pipeline is US$kminch.
a
Estimate the pipe diameter and total investment of the project!
b
Also calculate the gas transmission cost in US$mmbtu using the levelised cost method!
c
Calculate the toll fee using the cash flow method: assuming a lifetime of years, interest rate loan equity all from loan cash flow, interest rate loan equity and use the rules of BPH compare the levelised cost and the estimated pipeline tariff from Seddon's book. Include other assumptions as needed!
d
Calculate the ratio of cash flow to levelised cost.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started