PT X is building a 2 7 5 km natural gas transmission line from Gresik to supply gas for power generation and industry in Semarang,

PT X is building a 275 km natural gas transmission line from Gresik to supply gas for power generation and industry in Semarang, Central Java with a capacity of 500 mmscfd. If the investment cost of the pipeline is 40,000 US$/km-inch.
a)
Estimate the pipe diameter and total investment of the project!
b)
Also calculate the gas transmission cost in US$/mmbtu using the levelised cost method!
c)
Calculate the toll fee using the cash flow method: assuming a lifetime of 30 years, interest rate loan 6%, equity =0%(all from loan), cash flow, interest rate loan 6%, equity =30%, and use the rules of BPH, compare the levelised cost and the estimated pipeline tariff from Seddon's book. Include other assumptions as needed!
d)
Calculate the ratio of cash flow to levelised cost.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Chemical Engineering Thermodynamics

Authors: J.M. Smith, Mark Swihart Hendrick C. Van Ness, Michael Abbott

9th International Edition

1260597687, 978-1260597684

More Books

Students also viewed these Chemical Engineering questions