QUESTION 1 [36] Given the product structure, the maser production schedule, and the lead time shown in the figure below: 1. Identify all levels, parents,
QUESTION 1 [36] Given the product structure, the maser production schedule, and the lead time shown in the figure below: 1. Identify all levels, parents, and components if 100 units of S are required (BOM). 2. Construct a gross material requirements plan. (8) 3. Construct a net requirements plan using the following on-hand inventory and lead time. (17)