Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

QUESTION 1 Step 1 You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables.

image text in transcribedimage text in transcribedimage text in transcribedQUESTION 1

Step 1

You work for Thunderduck Custom Tables Inc. This is the first month of operations. The company designs and manufactures specialty tables. Each table is specially customized for the customer. This month, you have been asked to develop and manufacture two new tables for customers. You will design and build the tables. This is a no nail, no screw, and no glue manufacturing ( no indirect materials used). You will be keeping track of the costs incurred to manufacture the tables using Job #1 Cost Sheet and Job #2 Cost Sheet.

The cost of the direct materials that can be used to manufacture the table are as follows. These cost are on a per unit basis.

Table Top

$1,800.00

Table Leg

$550.00

Drawer

$380.00

The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours.

The company estimates that there will be 12 direct labor hours worked during the month.

The estimated manufacturing overhead cost for the month is:

a.

Factory supervisor salary per month

$4,000.00

b.

Rent for the factory per month

$1,400.00

c.

Depreciation of factory equipment per month

$600.00

Total Estimated manufacturing overhead

$6,000.00

What is the predetermined manufacturing overhead rate?

Step 2

The first order you received was to manufacture a table using a table top and four legs. This is your Job #1.

Step 3

The customer that has ordered Job #2, wants a table that is the same as Job #1, but wants to also add a drawer to the table.

Step 4

The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journal" tab of the excel file using the proper format. Please use the following accounts: Accounts Receivables, Raw materials, Work in process, Finished goods, Accumulated depreciation, Accounts payable, Salaries and wages payable, Sales revenue, Manufacturing overhead, Cost of goods sold, Salaries and wages expense, Advertising expenses, and Depreciation expense.

1-Dec

Raw Materials purchased on account, $18,000.

5-Dec

All Raw Materials needed for Job #1 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #1 Cost Sheet)

10-Dec

The following employee costs were incurred but not paid during the month:

There are three assembly employees that spend 2 hours each, $20 per hour to make the table for Job #1. (After you journalize this entry please enter the information into Job #1 Cost Sheet)

Salary for supervisor of the factory $4,500.

Administrative Salary $2,000.

15-Dec

All Raw Materials needed for Job #2 were requisitioned from the material storage for use during the month. Assume all materials are direct. (After you journalize this entry please enter the information into Job #2 Cost Sheet)

16-Dec

Rent for the month of December for the factory building incurred but not paid $1,400.

17-Dec

Advertising costs incurred but not paid for the month was $1,600.

20-Dec

Depreciation for the month of December was recorded on equipment was $750 ($150 for equipment used in the factory and the remainder for equipment used in selling and administrative activities).

22-Dec

Manufacturing overhead cost was applied based on direct labor hours to Job #1 based on the POHR determined on the "Job Cost Sheet". (After you journalize this entry please enter the information into Job #1 Cost Sheet)

26-Dec

Job #1 was completed and transferred to Finished Goods during the month.

28-Dec

The completed table from Job #1 was sold on account to the customer for $23,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.)

31-Dec

Direct labor cost incurred but not paid for three employees to start manufacturing Job #2. The employees only worked one hour each, three hours total, $20 per hour during the month and they did not complete their work on the job. (After you journalize this entry please enter the information into Job #2 Cost Sheet)

31-Dec

Manufacturing overhead cost was applied based on direct labor hours to Job #2 based on the POHR. Only three direct labor hours were worked on Job #2 during the month. (After you journalize this entry please enter the information into Job #2 Cost Sheet)

31-Dec

Any underapplied or overapplied overhead for the month was closed out to Cost of Goods Sold.

Step 5

Post the journal entries that you recorded on the "General Journal" tab to the "T-accounts" tab. This is the company's first month of business, so there will not be any beginning balances. Compute the balance for each T-account after all of the entries have been posted.

Step 6

Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS" tab for Job #1 and Job #2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 87). (Hint: This is the company's first month of operations and therefore the beginning balances will be zero.)

Step 7

Prepare an Income Statement for the month using the Traditional Format on the "Income Statement" tab.

Step 8

Answer the additional questions below

Check Figure: Cost of Goods Manufactured= $7,120, Net operating income=$10,130

What is the ending balance for raw materials?

What is the ending balance for work in process?

What is the ending balance for finished goods?

What is the actual manufacturing overhead cost incurred during December before adjustment?

What is the total applied manufacturing overhead cost during December before adjustment?

What is the unadjusted cost of goods sold?

Was the manufacturing overhead for the month of December overapplied/underapplied ?

What is the amount of Manufacturing overhead overapplied/underapplied?

What is the adjusted cost of goods sold?

What is gross margin?

What is the total prime cost for Job#1?

What is the total conversion cost for job #1?

What is the total product cost for job#1?

What was the period cost incurred for the month of December?

What is the total variable cost incurred for Job #1(assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)?

What is the contribution margin for Job #1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.)?

What would be the actual (not applied) total fixed manufacturing overhead cost incurred for the company for the month if the order in Job #1 is for five tables instead of one table assuming this cost is within the relevant range?

Debit Credit General Journal Date Description 1-Dec Raw Materials Accounts Payable $ 10.000 $ 18,000 4.000 5-Dec Work in Process Raw Materials 4,000 $ 9,200 10-Dec Salaries and Wage Expense Salaries and Wage Payable $ 9,200 12 10-Dec Work in Process Manufacturing Overhead Salaries and Wages Expense Salaries and Wages Payable 120 4500 2000 6.620 17 $ 4,300 15 Dec Work in Process Raw Materials 4,380 20 1 6-Dec Rent Expense Rent Payable $ 1,400 $ 1,400 23 $ 1.600 17-Dec Advertising Expense Accounts Payable $ 1.600 20-Dec Selling and Administrative Expense Depreciation Expense Accumulated Depreciation $ $ 600 150 30 22-Dec Work in Process Manufacturing Overhead 33 26-Dec Finished Goods Work in Process 28-Dec Accounts Receivable Sales Revenue 39 28-Dec cost of Goods Sold Finished Goods 42 31-Dec Work in Process Salaries and Wages Payable 45 31-Dec Work in Process Manufacturing Overhead 48 31-Dec cost of Goods Sold Manufacturing Overhead E F G H Account Receivables By Balance c/f Sales Revenue BY A/R To Sales To Balance cif Accounts Payable By Raw Material By Rent Exp. By Adv. Exp. To COGS To Gross Prof. Salaries and Wages Payable By S&W Exp. To A/P By Balance clf Raw Materials BY WIP (Job 1) By WIP (Job A2) By Man. Overhead. By Sell & Adm. Exp. Cost of Goods Sold To Finished Goods By Sales Rev. To Man Overhead 20 To Raw Materials 21 To S&W Exp. 22 To Man. Overhead Work In Process By Finished Goods By Balance c/f Salaries and Wages Expense To S&W Pay. By WIP ob 1) By WIP (Job 12) By Man. Overhead By S&Adm. Exp. Finished Goods By COGS To WIP Advertising Expense By S&Adm. Exp. TO A/P Depreciation Expense To Accum. Dep. By Man. Overhead By S&Adm. Exp. Manufacturing Overhead By WIP deb 11) By WIP (Job 2) By COGS 40 To S&W Exp. 41 To Rent Exp. 42 TO Dep. Exp. Accumulated Depreciation By Dep. To Equip Thunderduck Custom Tables, Inc. Schedule of cost of goods manufactured For the month Ended December 31, 20XX 5 Direct Materials 6 Raw Materials purchased: 18000 7 Less: RM Inventory, Dec. 31 180 9 Direct Labor 10 Manufacturing Overhead- 11 Indirect labor: 12 Ret expense: 13 Dep. Expense: 14 Total cost of Work in process: 15 Less: Work in process, Dec. 31 16 COGS: 4500 1400 150 Thunderduck Custom Tables, Inc. Cost of goods sold For the month Ended December 31, 20XX 21 COGS: 22 Add: Finished Goods inv. Dec 1 23 COG available for sale: 24 Less: Finished goods inv., Dec 31 25 COGS: Thunderduck Custom Tables, Inc. Income Statement For the month Ended December 31, 20XX 30 Sales: 31 Less: COGS: 32 Gross Profit 33 Less: Selling and Admin. Expenses: 34 Op. income: Debit Credit General Journal Date Description 1-Dec Raw Materials Accounts Payable $ 10.000 $ 18,000 4.000 5-Dec Work in Process Raw Materials 4,000 $ 9,200 10-Dec Salaries and Wage Expense Salaries and Wage Payable $ 9,200 12 10-Dec Work in Process Manufacturing Overhead Salaries and Wages Expense Salaries and Wages Payable 120 4500 2000 6.620 17 $ 4,300 15 Dec Work in Process Raw Materials 4,380 20 1 6-Dec Rent Expense Rent Payable $ 1,400 $ 1,400 23 $ 1.600 17-Dec Advertising Expense Accounts Payable $ 1.600 20-Dec Selling and Administrative Expense Depreciation Expense Accumulated Depreciation $ $ 600 150 30 22-Dec Work in Process Manufacturing Overhead 33 26-Dec Finished Goods Work in Process 28-Dec Accounts Receivable Sales Revenue 39 28-Dec cost of Goods Sold Finished Goods 42 31-Dec Work in Process Salaries and Wages Payable 45 31-Dec Work in Process Manufacturing Overhead 48 31-Dec cost of Goods Sold Manufacturing Overhead E F G H Account Receivables By Balance c/f Sales Revenue BY A/R To Sales To Balance cif Accounts Payable By Raw Material By Rent Exp. By Adv. Exp. To COGS To Gross Prof. Salaries and Wages Payable By S&W Exp. To A/P By Balance clf Raw Materials BY WIP (Job 1) By WIP (Job A2) By Man. Overhead. By Sell & Adm. Exp. Cost of Goods Sold To Finished Goods By Sales Rev. To Man Overhead 20 To Raw Materials 21 To S&W Exp. 22 To Man. Overhead Work In Process By Finished Goods By Balance c/f Salaries and Wages Expense To S&W Pay. By WIP ob 1) By WIP (Job 12) By Man. Overhead By S&Adm. Exp. Finished Goods By COGS To WIP Advertising Expense By S&Adm. Exp. TO A/P Depreciation Expense To Accum. Dep. By Man. Overhead By S&Adm. Exp. Manufacturing Overhead By WIP deb 11) By WIP (Job 2) By COGS 40 To S&W Exp. 41 To Rent Exp. 42 TO Dep. Exp. Accumulated Depreciation By Dep. To Equip Thunderduck Custom Tables, Inc. Schedule of cost of goods manufactured For the month Ended December 31, 20XX 5 Direct Materials 6 Raw Materials purchased: 18000 7 Less: RM Inventory, Dec. 31 180 9 Direct Labor 10 Manufacturing Overhead- 11 Indirect labor: 12 Ret expense: 13 Dep. Expense: 14 Total cost of Work in process: 15 Less: Work in process, Dec. 31 16 COGS: 4500 1400 150 Thunderduck Custom Tables, Inc. Cost of goods sold For the month Ended December 31, 20XX 21 COGS: 22 Add: Finished Goods inv. Dec 1 23 COG available for sale: 24 Less: Finished goods inv., Dec 31 25 COGS: Thunderduck Custom Tables, Inc. Income Statement For the month Ended December 31, 20XX 30 Sales: 31 Less: COGS: 32 Gross Profit 33 Less: Selling and Admin. Expenses: 34 Op. income

Step by Step Solution

There are 3 Steps involved in it

Step: 1

Sure lets first handle the computational parts Step 1 Predetermined Overhead Rate The predetermined manufacturing overhead rate POHR is calculated as POHR Estimated Total Manufacturing Overhead Estima... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Standard For Auditing Computer Applications

Authors: Martin A. Krist

2nd Edition

0849399831, 978-0849399831

More Books

Students also viewed these Accounting questions

Question

16. @ To survey water areas for possible oil fields

Answered: 1 week ago

Question

Identify conflict triggers in yourself and others

Answered: 1 week ago