Question 2 (6 marks) A time study is conducted on a manufacturing operation. The results of the study are (in minutes): Cycle Performance Work element

Question 2 (6 marks) A time study is conducted on a manufacturing operation. The results of the study are (in minutes): Cycle Performance Work element 1 2 3 4 5 6 7 8 Ratiing 1. Get & position unit 0.22 0.27 0.19 0.24 0.17 0.24 0.21 0.18 1.10 2. Perform calibration 2.20 2.70 2.50 3.10 2.80 2.40 3.20 2.70 1.30 3. Perform standard test 4.60 4.00 4.50 3.80 4.30 4.50 3.90 4.40 0.85 4. Update card and remove unit 0.50 0.50 0.70 0.60 0.80 0.40 0.50 0.60 1.20 Allowance per Eight-Hour Shift: Clothes change : 15 minutes Unavoidable delay : 35 Lunch : 30 Shower and change : 30 __________ Total : 110 minutes a. Compute the mean observed time for each element in minutes. b. Compute the normal time for each element AND total normal time in minutes. c. Compute the allowance fraction for the operation. Assume 480 minutes per shift. d. Compute the labor standard for the operation (Note: allowances are based on % of the time worked.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Supply Chain Management A Logistics Perspective

Authors: John coyle, John Langley, Robert Novack, Brain Gibson

9th edition

9780538479189, 9781285400945, 538479191, 538479183, 1285400941, 978-0538479196