Question Completion Status: QUESTION 1 For cost reduction purpose and when the management asks the supervisor to contribute the successful supervisor needs to True False QUESTION 2 Planners ignore repetitive file during planning process True False QUESTION 3 who makes sure all materials types and quantities are available for the work requested? maintenance planner maintenance inventory department maintenance store department maintenance Supervisor maintenance engineer Click Save and Submit to save and submit. Click Save All Ansters to save all annars 9 are responsible for developing the craft backlog, a total of all the labor requirements for work that is First-Line Maintenance Foreman or Supervisor Maintenance Manager Maintenance Engineer The Maintenance Planner QUESTIONS Line Scanners: Provides a somewhat larger field of view, i.e. area of machine surface, it is limited in predictive mainte True False QUESTION 6 List any four parameters that are monitored in condition monitoring technology bearing installation seismographs temperature broken gear teeth Click Save and Submit to save and submit. Click Save All Answers to save all answers - Question Completion Status: QUESTION 7 Identify any four most common warning signs of gear box problems damage to the painting oil contamination excessive noise lubrication leaks pitting corrosion frequent replacement of oil seals vibration QUESTION 8 Signature Analysis: signature analysis provides visual representation of each frequency component generated by a mach True False een or och trequency compe QUESTIONS Select any three areas of applications of chain-drive Click Save and submit to save and subunit. Click Save All Answers to save all answers Question Completion Status: QUESTION 1 For cost reduction purpose and when the management asks the supervisor to contribute the successful supervisor needs to True False QUESTION 2 Planners ignore repetitive file during planning process True False QUESTION 3 who makes sure all materials types and quantities are available for the work requested? maintenance planner maintenance inventory department maintenance store department maintenance Supervisor maintenance engineer Click Save and Submit to save and submit. Click Save All Ansters to save all annars 9 are responsible for developing the craft backlog, a total of all the labor requirements for work that is First-Line Maintenance Foreman or Supervisor Maintenance Manager Maintenance Engineer The Maintenance Planner QUESTIONS Line Scanners: Provides a somewhat larger field of view, i.e. area of machine surface, it is limited in predictive mainte True False QUESTION 6 List any four parameters that are monitored in condition monitoring technology bearing installation seismographs temperature broken gear teeth Click Save and Submit to save and submit. Click Save All Answers to save all answers - Question Completion Status: QUESTION 7 Identify any four most common warning signs of gear box problems damage to the painting oil contamination excessive noise lubrication leaks pitting corrosion frequent replacement of oil seals vibration QUESTION 8 Signature Analysis: signature analysis provides visual representation of each frequency component generated by a mach True False een or och trequency compe QUESTIONS Select any three areas of applications of chain-drive Click Save and submit to save and subunit. Click Save All Answers to save all answers