Question
Ramsey Company produces speakers (Model A and Model B). Both products pass through two producing departments. Model A's production is much more labor-intensive than that
Ramsey Company produces speakers (Model A and Model B). Both products pass through two producing departments. Model A's production is much more labor-intensive than that of Model B. Model B is also the more popular of the two speakers. The following data has been gathered for the two products:
Product Data | ||
Model A | Model B | |
Units produced per year | 10,000 | 100,000 |
Prime costs | $146,000 | $1,460,000 |
Direct labor hours | 139,000 | 310,000 |
Machine hours | 19,000 | 197,000 |
Production runs | 30 | 70 |
Inspection hours | 700 | 1,300 |
Maintenance hours | 12,000 | 88,000 |
Overhead costs: | ||
Setup costs | $280,000 | |
Inspection costs | 190,000 | |
Machining | 128,000 | |
Maintenance | 300,000 | |
Total | $898,000 |
1. Compute the overhead cost per unit for each product by using a plantwide rate based on direct labor hours. (Round to two decimal places.)
Plantwide rate:
Model A: | |
Model B: |
2. Compute the overhead cost per unit for each product by using ABC. (Round rates and unit overhead costs to two decimal places.)
Model A: | $fill in the blank 790b08f5d06c06b_1 overhead cost per unit |
Model B: | $fill in the blank 790b08f5d06c06b_2 overhead cost per unit |
Activity | Driver | Activity Rate |
Setups |
| runhour |
Inspections |
| $fill in the blank 790b08f5d06c06b_7 per runhour |
Machining |
| $fill in the blank 790b08f5d06c06b_10 per runhour |
Maintenance |
| $fill in the blank 790b08f5d06c06b_13 per runhour |
Overhead assignment | ||
Model A | Model B | |
Setups | $fill in the blank 790b08f5d06c06b_15 | $fill in the blank 790b08f5d06c06b_16 |
Inspections | fill in the blank 790b08f5d06c06b_17 | fill in the blank 790b08f5d06c06b_18 |
Machining | fill in the blank 790b08f5d06c06b_19 | fill in the blank 790b08f5d06c06b_20 |
Maintenance | fill in the blank 790b08f5d06c06b_21 | fill in the blank 790b08f5d06c06b_22 |
Total overhead | $fill in the blank 790b08f5d06c06b_23 | $fill in the blank 790b08f5d06c06b_24 |
Units produced | fill in the blank 790b08f5d06c06b_25 | fill in the blank 790b08f5d06c06b_26 |
Overhead per unit | $fill in the blank 790b08f5d06c06b_27 | $fill in the blank 790b08f5d06c06b_28 |
Question Content Area
3. Suppose that Ramsey decides to use departmental overhead rates. There are two departments: Department 1: (machine intensive) with a rate of $4 per machine hour and Department 2: (labor intensive) with a rate of $1 per direct labor hour. The consumption of these two drivers is as follows:
Department 1 Machine Hours | Department 2 Direct Labor Hours | |
Model A | 8,000 | 134,000 |
Model B | 180,000 | 280,000 |
Compute the overhead cost per unit for each product by using departmental rates. (Round to two decimal places.)
Model A: | $fill in the blank dbc21206efe0fa1_1 per unit |
Model B: | $fill in the blank dbc21206efe0fa1_2 per unit |
Question Content Area
4. CONCEPTUAL CONNECTION Using the activity-based product costs as the standard, comment on the ability of departmental rates to improve the accuracy of product costing. Did the departmental rates do better than the plantwide rate?
A common justification is to use
machinelabor
hours for machine-intensive departments and
machinelabor
hours for labor-intensive departments. Using activity-based costs as the standard, we can say that departmental rates
increaseddecreased
the accuracy of the overhead cost assignment for both products. The departmental rates cost A well
abovebelow
the ABC method while the plantwide rate costs A well
abovebelow
the ABC method. However, the rates of difference are very close. Looking at it this way, department costs are not clearly more wrong than the plantwide rate; they are wrong in a
differentsame
direction. The departmental rates
diddid not
do better than the plantwide rates.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started