RUIZ 1 Saved Vernon Industrtes produces two electronic decoders, P and Q Decoder Pis more sophisticated and requires more programming and testing than does Decoder Q. Because of these product differences, the company wants to use activity-based cosung to allocate overhead costs. It has identified four activity pools. Relevant information follows: Activity Pools Repair and maintenance on assembly machine Programming cost Software inspections product testing Total overhead cost CONE Paal Totul S 77, Bee 105,75e 7.280 11, 220 5201,250 Cost Driver Number of units produced Number of programming hours Number of inspections Number of tests Expected activity for each product follows: Nube nat 20.000 bee 55 Decoder P Decoder TOT Number of Programming Haus 21. 2.ou 9.500 Number of Inspections 180 Number of Tests 1. We 2.100 260 Required a. Compute the overhead rate for each activity pool b. Determine the overhead cast allocated to each product. Complete this question by entering your answers in the tabs below. Award A Required e 90 Required a. Compute the overhead rate for each activity pool, b. Determine the overhead cost allocated to each product. Complete this question by entering your answers in the tabs below. Required A Required B Compute the overhead rate for each activity pool. (Round your answers to 2 decimal places.) Allocation Rate Activity Pools Repair and maintenance on assembly machine Programming cost Software inspections Product testing Required B > a. Compute the overhead rate for each activity pool. b. Determine the overhead cost allocated to each product. Complete this question by entering your answers in the tabs below. Required A Required B Determine the overhead cost allocated to each product. (Round intermediate calculations to 2 decimal places.) Total Allocated Cost Decoder P Decoder