Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Scenario A (Question 1-3) Acme engineering is a general light engineering company that specializes in metallic fixtures and fittings. It manufactures various products to customer

image text in transcribed

image text in transcribed

Scenario A (Question 1-3) Acme engineering is a general light engineering company that specializes in metallic fixtures and fittings. It manufactures various products to customer order, and also has long term contracts to supply manufactured products to other companies. Acme is a "jobbing shop" involving craftspeople making specialized complete products - it is not a production line operation. The craftspeople work on early (6am2pm) and late (2pm10pm) shifts 5 days a week, and sometimes do overtime on Saturdays. The factory is always closed on Friday. Each shift has a supervisor. The management team consists of the Managing Director, Accountant and Sales Manager. They are assisted by two Administrative Assistants who work Sunday to Thursday, 8.30am to 5.30pm secify indicalons fon the cenli fiene pe ents The management team has decided that, in order to become more competitive, it needs more and better information on the costs involved in manufacturing. It wants to build up a database of time and cost information per manufacturing job, so that future work can be priced more accurately. This will involve recording the time spent on each manufacturing job, the costs of materials used, and the overhead costs. One problem is that Acme's craftspeople have always had a free hand to carry out their work however they like, as long as the finished fixtures and fittings conform to specification and meet deadlines. Und deve cop conting an plerl The MD has engaged an IT consultancy company to analyse the requirements and design a system to meet them. The team will include a consultant with extensive experience of implementing manufacturing control systems. ton eueu possible events Acme has provided the following list of requirements to the consultancy company: ? The system is to log the craftsperson, start and finish time and materials used for each manufacturing job. This must be possible on all shifts, including overtime. The data for time and materials used is to be captured on touch screens next to the machines on the factory floor so that the craftsperson's work is not disrupted. This facility is to be usable in a noisy and dirty workshop environment. The system is to calculate material costs and overhead costs incurred for each manufacturing job. * Successfelty complele plum un wulax ane - The system is to provide a "time spent" analysis (time to set up, time per step, rework time) report of the work done by each craftsperson. P(em, p The managing director would like a data mining type function to drill down on historic data and look at costs in total, or per product range, or per product type, or per craftsperson, over a flexible period of time, or for an individual piece of work. 6 The sales manager has asked for secure remote access via VPN using a laptop to the historic data on the system when working away from the office. PI 3. a. Use the "Three Level Scale" system to prioritize the requirements from the 5 scenario, justifying your prioritization in each case. b. Prepare the Requirement Traceability Matrix (RTM) for the requirements 5 described in the above scenario

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

More Books

Students also viewed these Databases questions

Question

6. Identify characteristics of whiteness.

Answered: 1 week ago

Question

e. What are notable achievements of the group?

Answered: 1 week ago