Serious Safety Products currently outsources an electrical switch that is a component in its sprinkler systems. The switches are purchased for $21 each. The company

Serious Safety Products currently outsources an electrical switch that is a component in its sprinkler systems. The switches are purchased for $21 each. The company is considering making the switches internally and has conducted a study to determine the costs involved. The costs below are projected annual production costs:

Unit-level material cost $4
Unit-level labor cost $3
Unit-level overhead $2
Batch-level cost (6,000 units per batch) $6,000
Product-level supervisory salaries $38,000
Allocated facility-level costs $21,000

Assume that the company needs 12,000 of the switches, which would be produced in three batches. Assume also that the company will still be operating within the relevant range. If Serious Safety decides to make the parts under these conditions, the total relevant costs will be:

$152,000. $173,000. $179,000. $158,000.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamental Managerial Accounting Concepts

Authors: Thomas P Edmonds, Philip R Olds

9th Edition

1259969509, 9781259969508

More Books

Students also viewed these Accounting questions