Single plant factory overhead rate Bach me in make the musical instruments: flutes, darinets, and oboes. The budgeted factory overhead cost is $120,000. Overhead
Single plant factory overhead rate Bach me in make the musical instruments: flutes, darinets, and oboes. The budgeted factory overhead cost is $120,000. Overhead is alle As The products have the following budgeted production volume and direct labor hours per unit: Budgeted Production Did Labor Hours Per 03 200 1.300 13 required, round all per unit awers to the nearest cent Raide overhead rate dermine the amount of total and per unit overhead allocated to each of the three product Per Unit Factory Overhead Cast Factory Overhead Cost Single plantwide factory overhead rate Bach Instruments Inc. makes three musical instruments: flutes, clarinets, and oboes. The budgeted factory overhead cost is $122,000. Overhead is allocated to the three products on the basis c hours. The products have the following budgeted production volume and direct labor hours per unit: Budgeted Production Volume Flutes Clarinets 1,800 units 700 Oboes 1,100 Direct Labor Hours Per Unit 0.5 1.5 1.0 If required, round all per unit answers to the nearest cent. a. Determine the single plantwide overhead rate. $ per direct labor hour b. Use the overhead rate in (a) to determine the amount of total and per-unit overhead allocated to each of the three products. Per Unit Total Factory Overhead Cost Factory Overhead Cost Flutes Clarinets Oboes Total
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started