Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

solve for doctor well testing 3. Following completion, a 18 well is produced for some time, believed to be in transient behavior, before shut in

solve for doctor well testing
image text in transcribed
3. Following completion, a 18 well is produced for some time, believed to be in transient behavior, before shut in for a lengthy build up test. The production history is summarised below: Np=qt 24hr If the fluid and reservoir properties are summarised as ionows. k=65md,h=50f,=0.22,=0.85cp,0=1.35rb/stb,Ct=35.0E06psi1, and pi=3500psi. I. Calculate the minimum drainage radius. II. Calculate the wellbore pressure at the end of the seventh day using Horner's approximation if applicable or any other method if it doesn't

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Chemical Engineering Thermodynamics

Authors: J.M. Smith, Mark Swihart Hendrick C. Van Ness, Michael Abbott

9th International Edition

1260597687, 978-1260597684

More Books

Students also viewed these Chemical Engineering questions

Question

Discuss the nature and functions of theory and theory construction.

Answered: 1 week ago