Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a small fabrication shop, Brenda Tolliver refers to herself as

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

Stage 1 ABC For Machine Shop: Assigning Costs to Activity As the chief engineer of a small fabrication shop, Brenda Tolliver refers to herself as a "jack-of-all-trades." n order for a new product comes in, Brenda must do the following: 1. Design the product to meet customer requirements. 2. Prepare a bill of materials (a list of materials required to produce the product). 3. Prepare an operations list (a sequential list of the steps involved in manufacturing the product). Each time the foundry manufactures a batch of the product, Brenda must perform these activities: 1. Schedule the job. 2. Supervise the setup of machines that will work on the job. 3. Inspect the first unit produced to verify that it meets specifications. Brenda supervises the production employees who perform the actual work on individual units of product. She is also responsible for employee training, ensuring that production facilities are in proper operating condition, and attending professional meetings. Brenda's estimates (in percent) of time spent on each of theses activities last year are as follows: 24% 19% 5% 2% Unit level activities: Supervising production Batch level activities: Scheduling jobs Supervising setups Inspecting first units Product level activities: Designing product Preparing bills of materials Preparing operations lists Facility level activities: Training employees Maintaining facility Attending professional meetings 13% 2% 6% 17% 7% 5% 100% Assuming Brenda Tolliver's salary is $128,000 per year, determine the dollar amount of her salary assigned to unit-, batch-, product, and facility-level activities. % of Time Spent on Activity Assignment of Salary 0 % 0% $ 0 % 0 % 0 % 0 % Unit level: Supervising production Total Batch level: Job scheduling Supervising setup First unit inspection Total Product level: Product design Preparing bills of materials Preparing operations lists Total Facility level: Employee training Facility maintenance Attending professional meetings Total Grand total 0 % 0 % 0 % 0 % 0 % 0 % 0 % 0 % 0% $

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Audit Committee Handbook

Authors: Louis Braiotta Jr.

4th Edition

0470226420, 978-0470226421

More Books

Students also viewed these Accounting questions