Question
Task 2: Ten samples of 80 kg concrete slabs produced by a machine are collected. Each sample has four observations (provided in the following table):
Task 2: Ten samples of 80 kg concrete slabs produced by a machine are collected. Each sample has four observations (provided in the following table):
Sample: | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 |
Observations | 79.2 | 80.5 | 79.6 | 78.9 | 80.5 | 79.7 | 79.6 | 78.7 | 79.4 | 79.4 |
78.8 | 78.7 | 79.6 | 79.4 | 79.6 | 80.6 | 79.6 | 79.6 | 80.3 | 80.4 | |
80.9 | 78.9 | 80.9 | 79.4 | 79.6 | 80.6 | 79.6 | 80.5 | 79.6 | 79.4 | |
79.9 | 80.9 | 80.3 | 79.6 | 80.3 | 80.4 | 80.4 | 78.9 | 80.5 | 79.7 |
Standard deviation of the 40 observations is 0.6432
If the weight specification limits for a slab are 79kg (LSL) and 81kg (USL), what is the Cpk? Is the production process capable? Why (not)? [4 Marks]
Using A2, D3 and D4 factors, determine the upper and lower control limits for sample mean and range, and decide if the process is in control. State the reason for your decision. [6 Marks]
(You can use Excel for accurate results. Show the calculations for Cpk and upper and lower control limits.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started