Question
Teldar Manufacturing Company is a diversified manufacturer that manufactures three products (M5, Z4, and I8) in a continuous production process. Senior management has asked the
Teldar Manufacturing Company is a diversified manufacturer that manufactures three products (M5, Z4, and I8) in a continuous production process. Senior management has asked the controller to conduct an activity-based costing study. The controller identified the amount of factory overhead required by the critical activities of the organization as follows:
1 | Activity | Activity Cost Pool |
2 | Production | $270,840.00 |
3 | Setup | 98,945.00 |
4 | Material handling | 10,604.00 |
5 | Inspection | 44,100.00 |
6 | Product engineering | 139,380.00 |
7 | Total | $563,869.00 |
The activity bases identified for each activity are as follows:
Activity | Activity Base |
---|---|
Production | Machine hours |
Setup | Number of setups |
Material handling | Number of parts |
Inspection | Number of inspection hours |
Product engineering | Number of engineering hours |
The activity-base usage quantities and units produced for the three products were determined from corporate records and are as follows:
Machine | Number of | Number of | Number of | Number of | ||
Hours | Setups | Parts | Inspection Hours | Engineering Hours | Units | |
M5 | 1,061 | 55 | 84 | 467 | 130 | 1,341 |
Z4 | 767 | 125 | 158 | 281 | 183 | 927 |
I8 | 392 | 205 | 240 | 232 | 192 | 542 |
Total | 2,220 | 385 | 482 | 980 | 505 | 2,810 |
Each product requires 0.77 machine hour per unit.
Required: | |||||||
Complete the Activity Tables for M5, Z4 and I8.
|
Required: | |||||||
Complete the Activity Table for M5.
|
M5 | |||||
Activity | Activity- | ||||
Base | Activity | Activity | |||
Usage | X | Rate | = | Cost | |
Production | mh | /mh | |||
Setup | setups | /setup | |||
Material handling | parts | /part | |||
Inspection | insp. hours | /hour | |||
Engineering | eng. hours | /hour | |||
Total activity cost | |||||
Number of units | |||||
Activity cost per unit |
Required: | |||||||
Complete the Activity Table for Z4.
|
Z4 | |||||
Activity | Activity- | ||||
Base | Activity | Activity | |||
Usage | X | Rate | = | Cost | |
Production | mh | /mh | |||
Setup | setups | /setup | |||
Material handling | parts | /part | |||
Inspection | insp. hours | /hour | |||
Engineering | eng. hours | /hour | |||
Total activity cost | |||||
Number of units | |||||
Activity cost per unit |
Required: | |||||||
Complete the Activity Table for I8.
|
I8 | |||||
Activity | Activity- | ||||
Base | Activity | Activity | |||
Usage | X | Rate | = | Cost | |
Production | mh | /mh | |||
Setup | setups | /setup | |||
Material handling | parts | /part | |||
Inspection | insp. hours | /hour | |||
Engineering | eng. hours | /hour | |||
Total activity cost | |||||
Number of units | |||||
Activity cost per unit |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started