thank you 2. A company operates a job costing system. The estimated costs for job 173 are as follows. Direct materials Direct labour 6 metres
thank you
2. A company operates a job costing system. The estimated costs for job 173 are as follows. Direct materials Direct labour 6 metres @ $22 per metre 15 hours @ $9 per hour Variable production overheads are recovered at the rate of RM 3.50 per direct labour hour. Fixed production overheads for the year are budgeted to be RM 300,000 and are to be recovered on the basis of the total of 50,000 direct labour hours for the year. Other overheads, in relation to selling and distribution and administration, are recovered at the rate of RM 85 per job. Calculate the total cost of Job 173Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started