Answered step by step
Verified Expert Solution
Question
1 Approved Answer
The Dervish Chemical Company operates a small plant for the manufacture of two joint chemical products X and Y. The production of these chemicals requires
The Dervish Chemical Company operates a small plant for the manufacture of two joint chemical products X and Y. The production of these chemicals requires two raw materials, A and B, which cost R5 and R8 per litre respectively. The maximum available supply per week is 3600 litres of A and 2000 litres of B. The plant can operate using either of two processes, which have differing operating costs and raw materials requirements for the production of X and Y, as follows. The plant can run for 120 hours per week in total but, for safety reasons, process 2 cannot be operated for more than 80 hours per week. The selling prices of output are: X R18 per litre Y R24 per litre Required: Formulate a linear programming model, and then solve it graphically to determine how the plant should be operated each week
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started