The following is production and cost information for a typical month, July. Units started Materials cost Conversion cost Total M-Solv (8- C-Solv (8- 155) 159) Total 1,900 10,500 12,400 $ 24,000 $ 38,000 $ 62,000 40,000 110,000 150,000 $ 64,000 5 148,000 $212,000 Required: a. Compute the unit costs of M-Solv and C-Solv for July using the current system (job costing) at Bouwens. b. Compute the cost of M-Solv and C-Solv for July if Bouwens were to treat all production as the same (combining 8-155 and 8-159 production) c. Recommend a costing method that best reflects the cost of producing M-Solv and C-Solv. d. For your recommended costing system, compute the cost of both M-Solv and C Solv for July 1. Compute the unit costs for materials and conversion costs separately. 2. Then compute conversion costs for the factory 3. Now.compute the unit product cost. Req A Req B Reqc Reg D1 Reg D2 Reg D3 Compute the unit costs of M-Solv and C-Solv for July using the current system (Job costing) at Bouwens. (Round "Unit cost to 2 decimal places.) M-Solv (B-155) C Soly (B-159) Materials costs Conversion costs Total costs Units produced Unit cost $ 0 $ 0 Req A Reg B Reqc Reg Di Reg D2 Reg 03 Compute the costs of M-Solv and C-Solv for July if Bouwens were to treat all production as the same (combining 8-155 and B- 159 production). (Round "Unit cost to 2 decimal places.) M. Soly (8.155) C Solv (B-159) Total Materials costs Conversion costs Total costs Units produced Unit cost $ 0 $ 0 $ 0 Req A Req B Reqc Req D1 Reg D2 Req D3 Recommend a costing method that best reflects the cost of producing M-Solv and C-Solv. Job costing Operations costing O Process costing Req A Reg B Reg C Reg 01 Reg D2 Reg D3 Compute the unit costs for materials and conversion costs separately. (Round "unit cost" to 2 decimal places.) M-Solv (8.155) C Solv (B.159) Materials costs Units produced Unit cost Reg A Reg B Reqc Reg D1 Reg D2 Req D3 Then compute conversion costs for the factory. (Round "Unit cost" to 2 decimal places.) M-Soly (B-155) C-Soly (B-159) Total Conversion costs Units produced Unit cost Req A ReqB Reqc Req D1 Reg D2 Req D3 Now, compute the unit product cost. (Round your answers to 2 decimal places.) M-Soly (B-155) C-Solv (B-159) Unit materials costs Conversion costs Total costs