Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The graph of the marginal cost function from the production of x thousand bottles of AC'(X) sunscreen per month [where cost C(x) is in thousands

image text in transcribedimage text in transcribedimage text in transcribed
image text in transcribedimage text in transcribedimage text in transcribed
The graph of the marginal cost function from the production of x thousand bottles of AC'(X) sunscreen per month [where cost C(x) is in thousands of dollars per month] is given in the 40- figure on the right. Complete parts (A) through (C) below. Thousand dollars/month 20- 1.* 3 Thousand bottles (A) Using the graph shown, describe the shape of the graph of the cost function C(x) as x increases from 0 to 6,000 bottles per month. Where is the cost function C(x) increasing and decreasing? O A. C(x) is increasing from x = 0 to x = 3 and is decreasing from x = 3 to x = 6. O B. C(x) is decreasing from x = 0 to x = 3 and is increasing from x = 3 to x = 6. O C. C(x) is decreasing from x = 0 to x = 6. O D. C(x) is increasing from x = 0 to x = 6.Math 135 Calculus | (Spring 2022): Sections 16-18 HAO ZENG ? E Homework: Homework: Section 4.9 (Antiderivatives) 0 The solution of the initial value problem is v(x) =].Homework: Homework: Section 4.9 Question 14, *5.1.89-BE HW Score: 15.24%, 6.4 of 42 points (Antiderivatives) Part 2 of 3 Points: 1 of 3 A defense contractor is starting production on a new missile control system. On the basis of data collected during the assembly of the first 4 control systems, the production manager obtained the function L'(x) =900x - describing the rate of labor use. For example, after assembly of 4 units, the rate of assembly is 450 labor-hours per unit, assembly of 16 units, the rate of assembly is 225 labor-hours per unit. The more units assembled, the more efficient the process. If 3,600 labor-hours are required to asse first 4 units, how many labor-hours L(x) will be required to assemble the first x units? The first 16? In order to find L(x), take the indefinite integral of L'(x). The number of labor-hours that will be required to assemble the first x units is L(x) = (Use integers or fractions for any numbers in the expression.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Advanced Engineering Mathematics, Enhanced

Authors: Erwin Kreyszig

10th Edition

1119446848, 9781119446842

More Books

Students also viewed these Mathematics questions