The management of Brawn Engineering is considering three alternatives to satisfy an OSHA requirement for safety gates in the machine shop. Each gate will
The management of Brawn Engineering is considering three alternatives to satisfy an OSHA requirement for safety gates in the machine shop. Each gate will completely satisfy the requirement, so no combinations need to be considered. The first costs, operating costs, and salvage values over a 5-year planning horizon are shown below. End of Year Gate 1 Gate 2 Gate 3 -$15,000 -$19,000 -$24,000 -$6,500 -$5,600 -$4,000 2. $6,500 $5,600 -$4,000 3 -$6,500 -$5,600 -$4,000 4. -$6,500 -$1,800 -$4,000 -$6,500 + S0 -$5,600 + $2.000 $4,000 + $5,000 What is the future worth of each alternative? Gate 1:$ Gate 2:$ Gate 3: $ IE Carry all interim calculations to 5 decimal places and then round your final answer to the nearest dollar. The tolerance is 10 Using a future worth analysis with a MARR of 20%/year, determine the preferred gate. Click here to access the TVM Factor Table Calculator Svetor Later
Step by Step Solution
★★★★★
3.38 Rating (157 Votes )
There are 3 Steps involved in it
Step: 1
Page No Date Salution GATE 15000 H6500 x PVAF 20 yrs 16000 6...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started