The precedence relationships for the purchase and installation of a new turbine at a power plant are tabulated below: i) Draw the Activity on Arrow
The precedence relationships for the purchase and installation of a new turbine at a power plant are tabulated below: i) Draw the Activity on Arrow (AOA) network diagram for the the project. [10] ii) Determine the duration of the project and identify the critical path. [5] iii) Draw an Activity on Node (AON) network diagram and hence determine the ES, EF, LF, LS and Slack for each activity. Identify the critical path. [10]