Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

The project was originally built in 1979 and has been vacant with utilities disconnected since 2017. The project was originally purchased as a starter home

image text in transcribed
image text in transcribed
The project was originally built in 1979 and has been vacant with utilities disconnected since 2017. The project was originally purchased as a starter home but may become an income property in the future. The owner is requiring a lot line to lot line refresh of the property. There are potential permits required to reconnect the utilities, but there is no major structural or mechanical additions or deletions expected. The suggested project budget is $50,000. The suggested project timeline is 6 weeks. Yard - Will be cleared of overgrown vegetation, and all debris, then install of ground cover. Roofing - will be removed of gravel, locate problem areas, make necessary repairs. Perform complete roof maintenance, repair penetration seals, around skylights, parapet flashing, and canals. Apply aluminum protective coating at all repairs. Exterior / Stucco /Paint-Exterior wall repair will consist of stucco repair and patch, trim repair, full synthetic stucco paint, and trim paint. Interior/ Drywall / Paint - Drywall will be Repaired, wallpaper removed, trim replaced, door hardware replaced, wall and ceiling paint. Flooring - Tear out existing flooring, debris removal. Installation of ceramic tile throughout house, except for installation of carpet in bedrooms. Kitchen - Tear out existing cabinetry/soffit, sink, appliances, debris removal, install new cabinetry (shaker door), granite counter tops, under mounted sink and new appliances, install backsplash. Bathrooms - Tear out existing tub, shower, toilets, vanities/sinks, accessories. Install new tub, shower, toilets, vanities/sinks, accessories, back splash. Electrical - Install power source and switches for ceiling fans at living room. Install light fixture boxes at master bedroom and living room. Reconnect services at electrical service panel. Windows - Remove existing and install new bedroom window. Doors - Replace damaged interior bedroom doors. Remove existing sliding door and Install new exterior French door bedroom, Remove existing sliding door/ Install new barndoor in sunroom. Lighting - Remove existing and install new exterior lighting. Remove existing and install new interior + Yard 2 Item Vendor Model# Item/ SKU# Quantity Unit Cost Material Cost Labor Hours Hourly Rate Labor Cost 4 tons of rock 2 types 5 30 bags of sol 6 132 feet of edging 7 Lowes Lowes $ $ $ 163210 17 Page 1 8 9 10 1000 SF of Rock 11 12 13 14 15 16 17 $ $ $ $ 5 5 $ $ $ s 5 $ 5 Total Material Cost Total Labor Cost The project was originally built in 1979 and has been vacant with utilities disconnected since 2017. The project was originally purchased as a starter home but may become an income property in the future. The owner is requiring a lot line to lot line refresh of the property. There are potential permits required to reconnect the utilities, but there is no major structural or mechanical additions or deletions expected. The suggested project budget is $50,000. The suggested project timeline is 6 weeks. Yard - Will be cleared of overgrown vegetation, and all debris, then install of ground cover. Roofing - will be removed of gravel, locate problem areas, make necessary repairs. Perform complete roof maintenance, repair penetration seals, around skylights, parapet flashing, and canals. Apply aluminum protective coating at all repairs. Exterior / Stucco /Paint-Exterior wall repair will consist of stucco repair and patch, trim repair, full synthetic stucco paint, and trim paint. Interior/ Drywall / Paint - Drywall will be Repaired, wallpaper removed, trim replaced, door hardware replaced, wall and ceiling paint. Flooring - Tear out existing flooring, debris removal. Installation of ceramic tile throughout house, except for installation of carpet in bedrooms. Kitchen - Tear out existing cabinetry/soffit, sink, appliances, debris removal, install new cabinetry (shaker door), granite counter tops, under mounted sink and new appliances, install backsplash. Bathrooms - Tear out existing tub, shower, toilets, vanities/sinks, accessories. Install new tub, shower, toilets, vanities/sinks, accessories, back splash. Electrical - Install power source and switches for ceiling fans at living room. Install light fixture boxes at master bedroom and living room. Reconnect services at electrical service panel. Windows - Remove existing and install new bedroom window. Doors - Replace damaged interior bedroom doors. Remove existing sliding door and Install new exterior French door bedroom, Remove existing sliding door/ Install new barndoor in sunroom. Lighting - Remove existing and install new exterior lighting. Remove existing and install new interior + Yard 2 Item Vendor Model# Item/ SKU# Quantity Unit Cost Material Cost Labor Hours Hourly Rate Labor Cost 4 tons of rock 2 types 5 30 bags of sol 6 132 feet of edging 7 Lowes Lowes $ $ $ 163210 17 Page 1 8 9 10 1000 SF of Rock 11 12 13 14 15 16 17 $ $ $ $ 5 5 $ $ $ s 5 $ 5 Total Material Cost Total Labor Cost

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Public Finance

Authors: Harvey S Rosen

7th Edition

0072876484, 978-0072876482

More Books

Students also viewed these Finance questions

Question

=+vii. Bullet points to emphasize important ideas.

Answered: 1 week ago