Question

1 Approved Answer

The student will select and installselect and install dry wall fire-rated systems to walls and ceilings. You must carefullyanalyse the information given in the 'plans

The student will select and installselect and install dry wall fire-rated systems to walls and ceilings. You must carefullyanalyse the information given in the 'plans and specifications' before initiating the work.

Thetrainerwillsupervise/observetheworkbystandingneartheworkinglocation.Thestudentwillbe

requiredtobringallnecessaryPPE'srequiredtocomplete

Toolandequipmentrequired

  • Broadknives

  • Caulkingguns

  • Hammers

  • Measuringtapesandrules

  • Powerdrills

  • Powerleads

  • Screwguns

  • Squares

  • Tinsnips

  • Trowels

  • Cclamps

  • Lockingsawsanddropsaws

  • Masonrydrills

  • Sawstools

  • Settingboxes

Materialsrequired:

  • Basecompoundcoats

  • Finishingcoats

  • Firegrademetalstudsandtrack

  • Firegradeplasterboardsheeting

  • Firesealants

  • Perforatedpapertapes

  • Vermiculiteorequivalentproduct.

Documentsrequired:

  • Australianstandards

  • Manufacturerspecifications,wherespecified

  • Workplaceoperationsandprocedures

  • Drawingsandspecifications

  • Environmentalmanagementplan

  • Sitesafetyplanandprocedures

Activity 8: Line timber joist ceiling using fire-rated system.

Thisactivityrequiresyoutolinetimberjoistceilingusingfire-ratedsystem.

.Checklist5:Linetimberjoistceilingusingfire-ratedsystem.

Steps

Tickmark,once completed

Step1:Checkceilingsubstrateandlinetomanufacturer'sfire-rating design.

Further,documenttheproceduresyouimplementedtocheckceiling substrate and line to manufacturer's fire-rating design using Template 5.

v

Step2:Selectfixingsandapplylining.

Further, document the procedures you implemented to select fixings and apply lining using Template 5.

v

Step3:Spacefixingsatcorrectintervals.

Further,documenttheproceduresyouimplementedtospacefixingsat correct intervals using Template 5.

v

Step4:Completepenetrations.

Further, document the procedures you implemented to complete penetrations using Template 5.

v

Step5:Finishjointstoexposedfacesheetlayersusingfire-ratedmaterials

andprocedurestomanufacturer'sfire-ratingdesign.

Further, document the procedures you implemented to finish joints to exposed face sheet layers using fire-rated materials and procedures to manufacturer's fire-rating design using Template 5.

v

pls complete template 5

Template5:Linetimberjoistceilingusingfire-ratedsystem.

Linetimberjoistceilingusingfire-ratedsystem.

Client Name: STC

Address: 16 Lotus St, Woolloongabba QLD 4102

Phone Number: 07)3891 3282

Date(dd/mm/yyyy)

Worker name: J

JobDetails:

Linetimberjoistceilingusingfire-ratedsystem Worker signature: J

Explanation

Procedures you implemented to check ceiling substrate and line to manufacturer's fire-rating design

Procedures you implemented toselect fixings and apply lining

Procedures you implemented tospace fixings at correct intervals

Procedures you implemented tocomplete penetrations

Procedures you implemented to finish joints to exposed face sheet layers using fire-rated materials and procedures to manufacturer's fire-rating design

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations Management

Authors: R. Dan Reid, Nada R. Sanders

4th edition

9780470556702, 470325046, 470556706, 978-0470325049

More Books

Students also viewed these General Management questions

Question

What are the registers that most processers have and describe

Answered: 1 week ago

Question

B. What tone will you try to project in your email?

Answered: 1 week ago