Answered step by step
Verified Expert Solution
Question
1 Approved Answer
This is a petroleum engineering question I think closest major (here in chegg) is chemical engineering so please if you are a good expert solve
This is a petroleum engineering question
I think closest major (here in chegg) is chemical engineering so please if you are a good expert solve it if you are not quite sure about it leave it to another good expert
Please show me all formulas and steps
Make everything as clear as possible
Pay attention to the units
Do not make me lose this questions points
Thanks
Q1. A 500ft cement plug is to be placed at a depth of 7000ft in order to sidetrack around a stuck BHA in 8.5 open hole with a capacity of 0.3941cuft/ft. The plug will be spotted through 5,19.5lb/ft open end drillpipe with 20 barrels of water pumped ahead of the slurry, which has a yield of 1.15cuft/sk. The annulus capacity is 0.2577cuft/ft, and the pipe capacity is 0.0997ft3/ft(0.01776bbl/ft). Determine the following: (a) Number of sacks of cement required (b) Volume of water spacer behind the slurry to balance the plug (c) Length of the balanced plug before pulling the pipe (d) Amount of the displacement mud required to spot the plug
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started