Answered step by step
Verified Expert Solution
Question
1 Approved Answer
To tul engineering cost is $556,416 and its total fixed $226,008. What would be the total production engineering cost per me cost is $556,416 and
To tul engineering cost is $556,416 and its total fixed $226,008. What would be the total production engineering cost per me cost is $556,416 and its total fixed production engineering cost is variable, at an activity level of 7,300 machine-hours in a ction engineering cost per machine-hour, both fixed and acvity level of 7,300 machine-hours in a month? Assume that this level 01 activity is within the relevant range. (Round interm A) $107.93 the relevant range. (Round intermediate calculations to 2 decimal places.) B) $107.18 C) $108.67 D) $108.24 unennex Corporation's relevant range of activity is 2,000 units to 6,000 units. When it produces and sells 4,000 units, its average costs per unit are as follows: Average Cost per Unit Direct materials $ 6.55 Direct labor $ 3.50 Variable manufacturing overhead $ 1.25 Fixed manufacturing overhead $ 3.00 Fixed selling expense $ 0.50 $ 0.40 Fixed administrative expense $ 1.50 Sales commissions $ 0.40 Variable administrative expense If 5,000 units are produced, the average fixed manufacturing cost per unit produced is closest to: A) $2.40 B) $2.70 C) $3.00 D) $3.75 18) Brault Corporation has provided the following information: Cost per Period, Direct materials Direct labor Cost per Unit $ 6.85 $ 3.85 $ 1.25
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started