Total Overhead Costs: $100,000; Activity 1 Cost Driver: 1,500 hours; Activity 2 Cost Driver: 800 orders. Requirements : Allocate overhead costs using activity-based costing. Calculate
- Requirements:
- Allocate overhead costs using activity-based costing.
- Calculate the overhead rate for each activity.
Total Overhead Costs: $100,000; Activity 1 Cost Driver: 1,500 hours; Activity 2 Cost Driver: 800 orders.