Dataspan, Incorporated, automated ats plant at the start of the current year and installed a fiexble manufocturing system. The company is ako evaluating its suppliess and moving toward Lean Producticn. Many adjustment problens have been oncountered, including prablems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four moneis of operations. Management has asked for your help in computing theoughput time, delivery cycle time, and MCt. The following average times have been logged over the last four months: Reeulred: Fa. Compute the throughput time for each month. 16. Compute the delvery cycle eime for esch manth. 1-c. Compute the manufacturing gycle etficiency (MCE) for each month 2. Evaluate the companys performance over the last four months. 3-a Acfer to the move time, process time, and so forth given for month 4 . Assume that in monsth 5 the move time. process time, and 10 forth, ate the same as in month 4, except that through the use of Lean Production the company is able to conplesely eliminate the queue time during production. Compute the new throughput time and MCE. 3-b. Refer to the more time, process time, and so forth, given for month 4. Assume in month 6 that the mave time, process time, and so forth, Oe again the same as in month 4 , except that the company is able to complesely eliminate both the queue time during preduction and the inspection time. Compute the new theoughput time and MCE. Camplete this question by entering your answers in the tabs below. Dataspan, Incorporated, automated ats plant at the start of the current year and installed a fiexble manufocturing system. The company is ako evaluating its suppliess and moving toward Lean Producticn. Many adjustment problens have been oncountered, including prablems relating to performance measurement. After much study, the company has decided to use the performance measures below, and it has gathered data relating to these measures for the first four moneis of operations. Management has asked for your help in computing theoughput time, delivery cycle time, and MCt. The following average times have been logged over the last four months: Reeulred: Fa. Compute the throughput time for each month. 16. Compute the delvery cycle eime for esch manth. 1-c. Compute the manufacturing gycle etficiency (MCE) for each month 2. Evaluate the companys performance over the last four months. 3-a Acfer to the move time, process time, and so forth given for month 4 . Assume that in monsth 5 the move time. process time, and 10 forth, ate the same as in month 4, except that through the use of Lean Production the company is able to conplesely eliminate the queue time during production. Compute the new throughput time and MCE. 3-b. Refer to the more time, process time, and so forth, given for month 4. Assume in month 6 that the mave time, process time, and so forth, Oe again the same as in month 4 , except that the company is able to complesely eliminate both the queue time during preduction and the inspection time. Compute the new theoughput time and MCE. Camplete this question by entering your answers in the tabs below