In the Victoria Chemical case, the preliminary engineering costs of GBP500,000 spent over the preceding nine months on efficiency and design studies of the renovation
In the Victoria Chemical case, the preliminary engineering costs of GBP500,000 spent over the preceding nine months on efficiency and design studies of the renovation is an example of: sunk cost overhead cost opportunity cost cannibalization