Question
True/False 5. An advantage of the V model is that each stage has a corresponding testing activity which helps to identify missing requirements, and incorrect
True/False
5. An advantage of the V model is that each stage has a corresponding testing activity which helps to identify missing requirements, and incorrect design early in the life cycle.
6. The DFD (Data Flow Diagram) should be used in lieu of a descriptive prose representation of a users process.
7. The PFD (Process Flow Diagram) can illuminate new processes and steps that could have been missed because it requires users to go through each phase of their system as it occurs or in an actual sequence.
8. A requirements document explains the logical flow of processes in a project.
9. The first step in LDM (Logical Data Modeling) is to create a master table.
10. A legacy system is an existing application system in operation.
11. BPR (Business Process Reengineering) is a methodology that is used to calculate lead time for tasks in a project.
12. The first step in applying successful BPR is to develop an approach to define the existing system and extracting its existing data elements and applications.
13. Acceptance test plans can be defined as a set of tests that if passed will establish that the software can be used in production.
14. ISO 9000 is a set of standards that define how projects are meant to be implemented.
15. There are three major steps that are necessary to move the application into a production environment: user training, ITs role, and the preparation steps for going live.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started