Two SGs are supplying a load by Pioad with 0.9 PF lagging. Gi has a no-load frequency of 54H2, and a slope Spi=1.1MW/Hz. G2

Two SGs are supplying a load by Pioad with 0.9 PF lagging. Gi has a no-load frequency of 54H2, and a slope Spi=1.1MW/Hz. G2 has a no-load frequency of 51HZ, and a slope Spr-1.1MW/Hz. If the system frequency is 50HZ: 1. How much power is supplied by each generator? 2. What is the load power Pload? 3. Draw the house-diagram for this system. 4. Find the system frequency, if the governor set points on G1 are decreased by 1Hz.

Step by Step Solution

3.44 Rating (160 Votes )

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Corporate Finance Core Principles and Applications

Authors: Stephen Ross, Randolph Westerfield, Jeffrey Jaffe, Bradford

3rd edition

978-0077971304, 77971302, 978-0073530680, 73530689, 978-0071221160, 71221166, 978-0077905200

More Books

Students also viewed these Electrical Engineering questions