Tyson Corner Manufacturing produces two bearings: C15 and C19. Data regarding these two bearings follow. C15 C19 Machine hours required per unit5.509.50 Standard cost per
Tyson Corner Manufacturing produces two bearings: C15 and C19. Data regarding these two bearings follow.
C15 C19
Machine hours required per unit5.509.50
Standard cost per unit
Direct material $9.50$11.00
Direct labor 12.0011.00
Manufacturing overhead:
Variable* 10.009.50
Fixed** 11.0012.00
Total $42.50$43.50
*Applied on the basis of direct labor hours
**Applied on the basis of machine hours
The company requires 6,600 units of C15 and 11,700 units of C19. Recently, management decided to devote additional machine time to other product lines, resulting in only 99,950 machine hours per year that can be dedicated to production of the bearings. An outside company has offered to sell Tyson Corner the bearings at prices of $48.50 for C15 and $48.50 for C19.
Required:
a. Assume that Tyson Corner decided to produce all C15s and purchase C19s only as needed. Determine the number of C19s to be purchased.(Round "Machine hours per unit" to 2 decimal places.)
Machine Hours available
Less: machine hours for C15
Machine hours available for C19
Machine hours per unit of C19
Units to be manufactured
Annual requirment
Less: Units to be manufactured
C19s to purchase
b. Compute the net benefit to the company of manufacturing (rather than purchasing) a unit of C15. Repeat the calculation for a unit of C19. (Note: in answering this question, do not take into consideration any machine hours constraint).(Round your answers to 2 decimal places.)
C15 C19
Direct Material
Direct labor
Variable Overhead
Total variable cost
Purchase price quoted
Less: Total variable cost
Net Benefit per unit of manufacturing
c. Tyson Corner lacks sufficient machine time to produce all of the C15s and C19s needed. Which component (C15 or C19) should Tyson Corner manufacture first with the limited machine hours available?
Which component (C15 or C19) should Tyson Corner manufacture first with the limited machine hours available??? ---------
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started