Use the information provided below to calculate the unit overheads cost using Activity Based Costing. INFORMATION The output of Project K of Turbo Limited is
Use the information provided below to calculate the unit overheads cost using Activity Based Costing.
INFORMATION The output of Project K of Turbo Limited is Product A and Product B and the company is keen on applying the principles of ABC costing. Relevant information pertaining to the two products for a given period appear below:
| Product A | Product B |
Output in units | 240 | 180 |
Machine hours per unit | 7 | 5 |
Direct materials | R100 | R80 |
Direct labour cost per unit | R49 | R35 |
The two products are similar and are usually produced in production runs of 20 units and sold in batches of 10.
Currently the production overheads are absorbed by using a machine hour rate, and the total of the production overheads for the period are as follows:
The cost drivers to be used for the overhead costs are as follows:
Machine department costs (rent, rates, depreciation and supervision) | 10 320 |
Set-up costs | 5 040 |
Stores receiving | 3 720 |
Inspection/Quality control | 2 100 |
Materials handling and dispatch | 4 620 |
The number of requisitions raised on the stores was 40 for each product and the number of orders executed was 42, each order being for a batch of 10 of a product
Set up costs | Number of production runs |
Stores receiving | Requisitions raised |
Inspection/Quality control | Number of production runs |
Materials handling/Dispatch | Orders executed |
Step by Step Solution
3.51 Rating (161 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started