Answered step by step
Verified Expert Solution
Question
1 Approved Answer
USE VISIO TO MAKE AN EQUIPMENT RACK WITH ALL THESE PARTS INCLUDED. Add a 3rd page/tab with a drawing of an equipment rack. Label the
USE VISIO TO MAKE AN EQUIPMENT RACK WITH ALL THESE PARTS INCLUDED.
Add a 3rd page/tab with a drawing of an equipment rack. Label the tab Rack. (Here are the dimensions of a basic equipment rack: http://www.ortronics.com/products/racks- cabinets/rack-systems/standard-eia/or-19-72-t2sd.aspx) Find rack and rack mount equipment by selecting More Shapes. Include 3 patch panels, 2 switches (two Rack Units each), a file server, a mail server, a database server, and a RAID array. Add a cable tray between the patch panel and switches and a keyboard tray below the servers. Add an outlet strip below the powered hardware. Add a UPS at the bottom of the rack. Label everything. Hint: Right click any rack mounted items and you will get a Shape Data box that will give you dimensions Add a 3rd page/tab with a drawing of an equipment rack. Label the tab Rack. (Here are the dimensions of a basic equipment rack: http://www.ortronics.com/products/racks- cabinets/rack-systems/standard-eia/or-19-72-t2sd.aspx) Find rack and rack mount equipment by selecting More Shapes. Include 3 patch panels, 2 switches (two Rack Units each), a file server, a mail server, a database server, and a RAID array. Add a cable tray between the patch panel and switches and a keyboard tray below the servers. Add an outlet strip below the powered hardware. Add a UPS at the bottom of the rack. Label everything. Hint: Right click any rack mounted items and you will get a Shape Data box that will give you dimensionsStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started