Value-Added and Non-Value-Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: An estimate of the non-value-added cost caused by each activity.

Value-Added and Non-Value-Added Costs, Unused Capacity

For Situations 1 through 6, provide the following information:

  1. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar.
  2. The root causes of the activity cost (such as plant layout, process design, and product design).
  3. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection.

Choose " Multiple" in the Root cause column, wherever there is more than one root cause.

  1. It takes 36 minutes and eight pounds of material to produce a product using a traditional manufacturing process. A process reengineering study provided a new manufacturing process design (using existing technology) that would take 6 minutes and 5 pounds of material. The cost per labor hour is $12, and the cost per pound of material is $11.
  2. With its original design, a product requires 13 hours of setup time. Redesigning the product could reduce the setup time to an absolute minimum of 26 minutes. The cost per hour of setup time is $160.
  3. A product currently requires five moves. By redesigning the manufacturing layout, the number of moves can be reduced from five to zero. The cost per move is $10.
  4. Inspection time for a plant is 15,000 hours per year. The cost of inspection consists of salaries of four inspectors, totaling $100,000. Inspection also uses supplies costing $10 per inspection hour. A supplier evaluation program, product redesign, and process redesign reduced the need for inspection by creating a zero-defect environment.
  5. Each unit of a product requires sixteen components. The average number of components is 16.3 due to component failure, requiring rework and extra components. By developing relations with the right suppliers and increasing the quality of the purchased component, the average number of components can be reduced to five components per unit. The cost per component is $700.
  6. A plant produces 1,500 different electronic products. Each product requires an average of 22 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 1,500 products so that they all have 11 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are $1,350,000 per year.
Case Non-Value-Added Cost Root Cause Cost Reduction
1 $ per unit Process design Activity selection
2 $ per setup Product design Activity reduction
3 $ per unit Plant layout Activity elimination
4 $ per year Multiple Activity elimination
5 $ per unit Suppliers Activity selection
6 $ per year Product design Activity sharing
image text in transcribed this is all the information given
a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection. Choose "Multiple" in the Root cause column, wherever there is more than one root cause 1. It takes 36 minutes and eight pounds of material to produce a product using a traditional manufacturing process. A process reengineering study provided a new manufacturing process design (using existing technology) that would take 6 minutes and 5 pounds of material. The cost per labor hour is $12, and the cost per pound of material is $11. 2. With its original design, a product requires 13 hours of setup time. Redesigning the product could reduce the setup time to an absolute minimum of 26 minutes. The cost per hour of setup time is $160. A product currently requires five moves. By redesigning the manufacturing layout, the number of moves can be reduced from five to zero. The cost per move is $10. 4. Inspection time for a plant is 15,000 hours per year. The cost of inspection consists of salaries of four inspectors, totaling $100,000. Inspection also uses supplies costing $10 per inspection hour. A supplier evaluation program, product redesign, and process redesign reduced the need for inspection by creating a zero- defect environment. 5. Each unit of a product requires sixteen components. The average number of components is 16.3 due to component failure, requiring rework and extra components. By developing relations with the right suppliers and increasing the quality of the purchased component, the average number of components can be reduced to five components per unit. The cost per component is $700. 6. A plant produces 1,500 different electronic products. Each product requires an average of 22 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 1,500 products so that they all have 11 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are $1,350,000 per year. Case Non-Value Added Cost Root Cause Cost Reduction perunt Process design Activity selection per Product design Plant layout Alle Activity

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions