Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Vista Electronics, Inc., manufactures two different types of coils used in electric motors. In the fall of the current year, Erica Becker, the controller, compiled
Vista Electronics, Inc., manufactures two different types of coils used in electric motors. In the fall of the current year, Erica Becker, the controller, compiled the following data.
- Sales forecast for 20x0 (all units to be shipped in 20x0):
Product | Units | Price | ||||
Light coil | 55,000 | $ | 250 | |||
Heavy coil | 35,000 | 350 | ||||
- Raw-material prices and inventory levels:
Raw Material | Expected Inventories, January 1, 20x0 | Desired Inventories, December 31, 20x0 | Anticipated Purchase Price | ||||||||
Sheet metal | 33,000 | lb. | 37,000 | lb. | $ | 14 | |||||
Copper wire | 30,000 | lb. | 33,000 | lb. | 7 | ||||||
Platform | 5,500 | units | 6,500 | units | 3 | ||||||
- Use of raw material:
Amount Used per Unit | ||||||||
Raw Material | Light Coil | Heavy Coil | ||||||
Sheet metal | 4 | lb. | 5 | lb. | ||||
Copper wire | 2 | lb. | 3 | lb. | ||||
Platform | 1 | unit | ||||||
- Direct-labor requirements and rates:
Product | Hours per Unit | Rate per Hour | |||||
Light coil | 4 | $ | 10 | ||||
Heavy coil | 6 | 15 | |||||
- Finished-goods inventories (in units):
Product | Expected January 1, 20x0 | Desired December 31, 20x0 | |||||
Light coil | 20,000 | 25,000 | |||||
Heavy coil | 8,000 | 9,000 | |||||
- Production overhead:
Overhead Cost Item | Activity-Based Budget Rate | ||
Purchasing and material handling | $ | 0.50 | per pound of sheet metal and copper wire purchased |
Depreciation, utilities, and inspection | $ | 6.00 | per coil produced (either type) |
Shipping | $ | 2.00 | per coil shipped (either type) |
General production overhead | $ | 4.00 | per direct-labor hour |
2. Prepare the production budget (in units) for 200. Prepare the raw material purchases budget (in quantities) for 200. 6. Prepare the production-overhead budget (in dollars) for 200. (Round "Cost Driver Rate" to 2 decimal places.) 5. Prepare the direct-labor budget (in dollars) for 200. Prepare the raw material purchases budget (in dollars) for 200. Required: 1. Prepare the sales budget (in dollars) for 200. *Red text indicates no response was expected in a cell or a formulabased calculation is incorrect; no points deducted
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started