Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers

Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 40%. When last calculated, Waymouths MCE was 35%.

Key measures from the recent months production, averaged over all the jobs during that period, are as follows:

Activity Average Time (hours)
New product development 30
Materials handling 2
Order setup 6
Machine maintenance 3
Order scheduling 1
Inspection of completed order 5
Pack and move to storage or ship 2
Manufacturing assembly 24
Order taking and checking 3
Receiving and stocking raw materials 6
Inspection of raw materials at start of production 2

Required:

Determine the manufacturing cycle efficiency (MCE) for the recent month. (Round your answer to 1 decimal place.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Business Accounting Uk Gaap Volume 1

Authors: Frank Wood, Alan Sangster

1st Edition

0273718762, 9780273718765

More Books

Students also viewed these Accounting questions