Which of the following is not true about tilt-up construction? Group of answer choices The wall panels must be erected immediately after concrete is placed
Which of the following is not true about tilt-up construction? Group of answer choices The wall panels must be erected immediately after concrete is placed and finished. A commercial bond breaker is used to keep the panels from adhering to the floor slab. It is a method of building concrete interior and exterior walls without the use of vertical formwork. Typically, the building floor slab is used as the casting bed for the wall panels