Question

1 Approved Answer

You are bidding on a project that requires the excavation of 500,000 Bank Cubic Yards of Common Earth. You have the option of either using

You are bidding on a project that requires the excavation of 500,000 Bank Cubic Yards of Common Earth. You have the option of either using a Large Excavator or a combination Dozer and Loader to excavate the earth. The Excavator costs $220 per hour with the operator included. The Excavator Bucket is 2 1/2 Loose Cubic Yards. The Dozer costs $155 per hour and the Loader costs $140 per hour. The Dozer blade has a capacity of 10 Loose Cubic Yards and the Bucket of the Loader has a capacity of 6 Loose Cubic Yards. Trucking must be included as well. You will use Trailer Dumps that can carry 25 Loose Cubic Yards and costs $110 per hour. The site where you can Stockpile the excavated material is a 40-minute round trip (20-minutes travel time in each direction). The plan is to work 8 hours per day, 5 days per week.

a.) Calculate the cost to excavate the material for each alternative.

b.) Calculate the time to excavate the material for each alternative.

c.) Give a recommendation on which alternative to use.

Step by Step Solution

3.50 Rating (153 Votes )

There are 3 Steps involved in it

Step: 1

Total 500000 bcy Given hydraulic factor 11 Hence total LCY 50000011 550000 Large Excavator ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Practical financial management

Authors: William r. Lasher

5th Edition

0324422636, 978-0324422634

More Books

Students also viewed these Finance questions

Question

In a system with light damping (c Answered: 1 week ago

Answered: 1 week ago