Question
You are considering two different methods for constructing a new warehouse site. The first method would use prefabricated building segments, would have an initial cost
You are considering two different methods for constructing a new warehouse site. The first method would use prefabricated building segments, would have an initial cost of $6.5 million, would have annual maintenance costs of $150,000, and would last for 25 years. The second alternative would employ a new carbon-fibre panel technology, would have an initial cost of $8.2 million, would have maintenance costs of $650,000 every ten years, and is expected to last 40 years. Both buildings would be in CCA Class 1 (at a rate of 4 percent) and it is expected that each would have a salvage value equivalent to 25 percent of its construction cost at the end of its useful life. The discount rate the firm uses in evaluating projects is 11 percent. The tax rate is 35 percent. |
What is the annual cost for each option? (Enter the answers in dollars. Do not round your intermediate calculations. Round the final answers to 2 decimal places. Negative answers should be indicated by a minus sign.) |
EAC | |
Pre-fab segments | $ |
Carbon-fibre technology | $ |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started