Question: E9.4 Table 9.9 shows the results obtained for daily throughput from a non-terminating simulation of a manufacturing facility. Five replications have been performed with the
E9.4 Table 9.9 shows the results obtained for daily throughput from a non-terminating simulation of a manufacturing facility. Five replications have been performed with the model. The results shown are the mean average of the five replications. Determine the warm-up period using:
a) The time-series inspection method
b) Welch’s method Compare the results obtained using the two methods.
Note: these data are available in a spreadsheet (Exercise9.xls) on the web site (www.wileyeurope.com/go/robinson).
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts