Question: Table 9.7 shows the results obtained for daily throughput from a nonterminating simulation of a manufacturing facility. Five replications have been performed with the model.
Table 9.7 shows the results obtained for daily throughput from a nonterminating simulation of a manufacturing facility. Five replications have been performed with the model. The results shown are the mean average of the five replications. Determine the warm-up period using:
a) The time-series inspection method
b) The MSER heuristic Compare the results obtained using the two methods.
Note: these data are available in a spreadsheet (Exercise9.xls) on the companion web site.