Question: Table 9.7 shows the results obtained for daily throughput from a nonterminating simulation of a manufacturing facility. Five replications have been performed with the model.

Table 9.7 shows the results obtained for daily throughput from a nonterminating simulation of a manufacturing facility. Five replications have been performed with the model. The results shown are the mean average of the five replications. Determine the warm-up period using:

a) The time-series inspection method

b) The MSER heuristic Compare the results obtained using the two methods.

Note: these data are available in a spreadsheet (Exercise9.xls) on the companion web site.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Simulation With Arena Questions!