2. What is the cumulative lead time for the E-Bike? Calculate it considering all the items shown...

Question:

2. What is the cumulative lead time for the E-Bike? Calculate it considering all the items shown in the product structure diagram

(Figure 8.13). Is it feasible for Fast Cycles to produce the bicycle in the 10-day lead time they are promising customers? Describe a strategy that will work to accomplish their lead time goal. Fast Cycles is a startup that makes an electric assist touring bicycle. The bike is designed to cruise at 30 mph and can travel 150 miles (or further with pedal assist) on a single battery charge. Users find it ideal for food delivery services since it can be equipped with a shelved storage attachment that can hold items up to 18 inches in width. The rugged design has special shock absorbers on the front and rear that make for a comfortable ride on roads with tar strips and other ruts and potholes.

The frame of the bike is fabricated from aluminum tubes which are cut and welded together using special jigs that were designed by Fast Cycles. Each frame is made by skilled workers in the Fast Cycles factory. Other parts, such as the wheel/tire assembly, brakes, motor, battery, electronic controller, and drive mechanism are purchased from vendors that specialize in these items. The shelved storage attachment module is an option that can be purchased with the bike.

It is also fabricated in the Fast Cycles factory.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question

Manufacturing Planning And Control For Supply Chain Management The CPIM Reference

ISBN: 9781265138516

3rd Edition

Authors: F. Robert Jacobs, William Lee Berry, D. Clay Whybark, Thomas E. Vollmann

Question Posted: