2.3 Consider the following noise-free data generated from the linear trend model dt = 2 + 3t....
Question:
2.3 Consider the following noise-free data generated from the linear trend model dt = 2 + 3t. Show that using the method illustrated in Figure 2.9 to estimate the initial slope and level, a double exponential smoothing method will provide noise-free forecast no matter what α and β values are used.
Time 1
2 3
4 5
6 7
8 9
10 11 12 Demand 5
8 11 14 17 20 23 26 29 32 35 38